FiFab (Fife Fabrication)

Glenrothes — 4 weeks

Design, Manufacture, Installation and Project Management

Summary

Following a recent flood at Scotland’s leading metal precision engineering company. Fifab approached us to refurbish and rebrand their head office. The site houses the 100,000sq ft manufacturing facility and 5000sq ft offices and conference facilities.

The flood destroyed the offices and conference facilities, meaning the building had to taken back to the shell internally and reinstate everything.

The client brief was to create a modern working environment and a welcoming visitor experience to showcase the work. Large training and conferencing facilities were a key part of the refurbishment.

Once the shell was completed we then started the internal furnishings. New flooring, kitchen, and office / conference furniture was supplied and installed.

Large feature graphics showcasing the machinery and products along with display plinths completed the interior.

Following on from the refurbishment we have been working with Fifab to develop their new trade exhibition stand which will be showcased through Europe.

Services

  • Design
  • Manufacture
  • Fixtures & Fittings
  • Installation
  • Project Management
  • Signage
IMG_4921 IMG_4920 IMG_4911 IMG_4907 IMG_4905 IMG_4925